Courses

Underground EPZ Grounding Simulator

Computer-based and VR training scenarios on using proper underground EPZ work methods.

  • Elbow Replacement – Replacing a bad elbow inside of a dead-front terminator
  • Replacing Cable Run – Replacing a bad run of cable between a handhole and switch cabinet with jacketed cable
  • Replacing a T – Replacing a bad 600 amp T in a handhold with unjacketed and jacketed cable
  • Live Equipment Replacement – Replacing a live front piece of equipment to a dead front with unjacketed cable
  • Changing a Switch – Changing a four way pad mounted switch

Request Presentation